1. Problem Narrative
Background and Context of Problem
About two centuries ago, the Knights of St. John had a dream. They had long harbored the idea of building a new city which was to replace The Citadel in Victoria as the Island’s Capital City. This new city was eventually dubbed ‘Fort Chambray’. The knights were convinced that the building of the new fort would boost the island’s economy, while at the same time strengthening the island’s defensive system. Unfortunately, Fort Chambray was unsuccessful in that it never attracted settlers. (Zerafa, [n.d.]) Decades later, the fort’s importance started to diminish until it eventually evolved from a communal monument to periods of abandonment and destruction. Today the fort has been transformed to a luxurious holiday complex, whereby modern development has completely altered the natural state of the fort. Sadly, much esteemed cultural property has been destroyed in the process.
Hence, the main problem which surrounds Fort Chambray is that speculators have been continuously ignoring the fort’s architectural and historical value, and are simply treating land as a cheap commodity. Development going on in this site proves a poor case of heritage management, whereby the developers’ obsession to generate a profit has completely undermined the fort’s historical value.
Behavior over Time
(Adapted from Zerafa, [n.d.])
- The building of Fort Chambray in 1749 which was to replace the ‘Gran Castello’ as the new capital city of Gozo.
- Failure to attract settlers left the fort derelict for a number of years, until it was taken over by the British garrison in the 1800’s when it served as military hospital.
- In 1934 the fort was used as a lunatic asylum.
- The fort was completely abandoned for a number of decades beyond this particular point in time.
- Once the fort was abandoned, Fort Chambray, an asset which carries great cultural value and which was open for public access, was in a severe state of degradation.
- With no funds to restore it, privatization became a tempting option.
- In 1971, the Maltese government developed plans to transform the fort into a tourist establishment. (www.ghajnsielem.com/places/chambray.hmtl)
- The year 1993 marks the new era of Fort Chambray, as permission to develop the fort was given to Fort Chambray Development Limited under a 99-year emphyteutical grant. The project was not successful, and eventually development was halted due to financial constraints. (Ibid.)
- Today Fort Chambray is owned by the well-respected Gozitan businessman Dr. Micheal Caruana and his family. A permit has been issued to develop the fort under new terms and conditions, and to complete such development within a specific time-frame. However, the owner has the sole responsibility to restore historic structures present at the fort. (Ibid.)
- Privatization brought about intense feelings of alienation for individuals who had spent most of their lives in close proximity to and in constant interaction with the fort.
- The result is a landscape of conflict where space serves as a function of spatial tension.
Policies in existence
Policies listed in the Structure Plan for the Maltese Islands (1990) are explicitly designed to tackle development within our islands. Fort Chambray contains buildings and fortifications which are located within a Rural Conservation Area in which urban policies must be applied (MEPA, 1992). In general, structure plan policies emphasize “the need for strict control throughout the islands of the location and character of future developments” (MEPA, 1990). Amongst others, these structure plan policies (MEPA, 1990) include:
- Policy UCO 6 highlights the need to preserve and enhance buildings of architectural and historic importance
- Policy UCO 10 prohibits development which adversely affects views or traditional skylines.
- Policy RCO 2 specifically states that “within Rural Conservation Areas no form of urban development will be allowed”.
- Policy RCO 4 deals particularly with scenic value. According to such policy, the Planning Authority will not allow any development which, amongst others:
· breaks a presently undisturbed skyline
· visually dominates or disrupts its surroundings because of its mass or location
· obstructs a pleasant and panoramic view
· adversely affects existing trees or shrubs
Concerns with current policies
First and foremost, many of these policies are not enforced. Development has actually taken place within a Rural Conservation Area, so Policy RCO2 has been completely overlooked. Buildings of historic and architectural importance are in a severe state of degradation, while restoration within the fort is limited. The Garrison Cemetery was completely demolished and there are also plans to destroy the British Barracks. Again, preservation policies have not been fully enforced. Additionally, PA02024/07 reveals plans to build a five-story hotel within the premises. How will this affect the ‘undisturbed skyline’ and ‘panoramic view’? It becomes clear that enforcement by the competent authorities is a major concern when it comes to these policies.
2. Statement of Study Purpose
The main aim of this study is to develop a systems dynamics model which provides alternative policy solutions to tackle the problem of ongoing development within an area of significant architectural and historic importance. Such a model would primarily attempt to strike a balance between development and the preservation of cultural property. Additionally, such a model can be the key to developing a common understanding between stakeholders and to promoting a healthy sustainable community.
Questions the study intends to address
- Does development at Fort Chambray have the potential to deliver a sustainable economy, environment and society?
- Are historical structures and buildings adequately preserved?
- What is the relationship between the local’s past and present links with the fort? If locals no longer visit the fort, why?
- Who are the potential buyers of housing units with the fort?
- Are there any conflicts between villagers and residents of the fort and between different stakeholders?
References:
MEPA. 1992. Fort Chambray Development Brief, Planning Services Division, Ministry for Development of Infrastructure, Government of Malta.
MEPA. 1990. Structure Plan for the Maltese Islands, Chapter 15: Conservation Policies, Planning Services Division, Ministry for Development of Infrastructure, Government of Malta.
Zerafa, J. [n.d.]. Unpublished history of Fort Chambray.